2020-2021

Complete study of the concrete and steel structure, main and secondary structure of the 6.3 MVA substation

  • Design notes for main structure and connections
  • Design notes for secondary structure
  • MTO
  • Overall drawings
  • Detail and overall drawings

Client: TTI - Technip Energies - La SAR

 

STRUCTURAL ASSEMBLY AND FABRICATION DRAWINGS