REVAMPING OF THE PEANUT OIL DETOXIFICATION WORKSHOP

SONACOS

REVAMPING OF THE PEANUT OIL DETOXIFICATION WORKSHOP 

2019-2020

  • Workshop performance optimization study; 
  • Replacement of supervision station; 
  • Replacement of control instruments;
  • Modification of feeding system and harvesting of detoxification tanks; 
  • Functional analyses;
  • Commissioning.

Client: SONACOS

22M COFFERDAM FOR THE DIAMA HYDROELECTRIC DAM
OMVS